flag-waver
Legendary Member
To decide which bloc and how much will participate in the auction ; out of 10 block
Does he have powers to approve which company takes which block? or is this a decision that is for the government as a whole?
To decide which bloc and how much will participate in the auction ; out of 10 block
Not that the government but he decide wich block and level of productionDoes he have powers to approve which company takes which block? or is this a decision that is for the government as a whole?
Not that the government but he decide wich block and level of production
He will start from north and south, batroun, Tripoli and three in the south; that's the bassil /berry compromise .I suggest he starts with the North then work his way down. All this money should be used for Infrastructure which is why in the next government the Public Works ministry is one that she should be fought for. We need Infrastructure and Electricity badly. It could be used also to reduce the debt of the government but it is not a big issue as the debt is locally not from outside.
He will start from north and south, batroun, Tripoli and three in the south; that's the bassil /berry compromise .after 3 years of infighting....As for ressources a sovereign fund should be established but there is a debate who will preside it the President or the Prime minister; in general prime minister preside all comity\councils but the Christians or bassil was saying the president preside council of ministers/council of defense so same to sovereign funds
Sure the funds head by President but this fund is for all Lebanese ....No one is allowed to take from FPM the work they have done in the ministry for years. This is our ministry and a fund should be generated under the same minister in question. If not the minister then the President or a christian. They had the south and the jabal funds for 25 years.
Sure the funds head by President but this fund is for all Lebanese ....
Great work but the state share and no corruption is the most essential; chapeau for Bassil until know; hope this continue well without corruptionSo here are the details in short:
- The legal procedures for searching and extracting are now done and approved
- The oil and gas committee will inform the 46 companies that were previously interested and applied (back in 2013).
- The committee will send to the companies later on (no date specified) the conditions to be accepted and bidding will start.
- Stage 1 bidding will be for 5 blocks out of 10 (as mentioned by the screenshot below)
![]()
- Bidding will go by BLOCK
- 5 million USD should be deposited by the company
- The oil and gas committee will study the proposals and inform the minister of the winners in a detailed report
- The minister informs the government
- The government takes the decision for each block/company and grant the companies licenses. (check screenshot)
![]()
- The search phase duration is 5 years (can be extended for an additional year only)
- The company have to inform the government if a field has been discovered, if the discovered field is big enough and after the government approved, the company involved should start digging.
Note:
- The government should issue the oil and gas taxation law
Source: الاستكشاف أولا... والمهلة الاقصى 6 سنوات
Because crook Berry was holding the decrees as hostagesOne of the few times he makes sense
استغرب عضو كتلة "التنمية والتحرير" قاسم هاشم "السرعة في اقرار المراسيم داخل مجلس الوزراء يوم امس، مشيرا الى ان الأمور ظهرت وكأن "وحياً" أوحى للوزراء بالموافقة على مراسيم كانت معطلة منذ 3 سنوات.
واضاف هاشم في حديث لـ"النشرة": "لا شك أن جلسة أمس بدت منتجة بالشكل ومبشرة بالخير ولكن من حق المواطنين أن يسألوا عن سبب حرمانهم لثلاث سنوات من مراسيم النفط ولماذا لم تقر سابقا طالما أن اقرارها جاء نفسه، والمراسيم لم تتغير بأي كلمة منها"، مشيرا الى انه لا يكفي القول أن مجلس الوزراء أقر كذا وكذا بل يجب اعطاء الاجابات للنا
Because crook Berry was holding the decrees as hostages
Yeah they seem to be some contradiction between what he said and LBC report below.I thought it was 5, 6 and 9?
So here are the details in short:
- The legal procedures for searching and extracting are now done and approved
- The oil and gas committee will inform the 46 companies that were previously interested and applied (back in 2013).
- The committee will send to the companies later on (no date specified) the conditions to be accepted and bidding will start.
- Stage 1 bidding will be for 5 blocks out of 10 (as mentioned by the screenshot below)
![]()
- Bidding will go by BLOCK
- 5 million USD should be deposited by the company
- The oil and gas committee will study the proposals and inform the minister of the winners in a detailed report
- The minister informs the government
- The government takes the decision for each block/company and grant the companies licenses. (check screenshot)
![]()
- The search phase duration is 5 years (can be extended for an additional year only)
- The company have to inform the government if a field has been discovered, if the discovered field is big enough and after the government approved, the company involved should start digging.
Note:
- The government should issue the oil and gas taxation law
Source: الاستكشاف أولا... والمهلة الاقصى 6 سنوات