Total receives its first & second shipment of oil and gas drilling equipment in Lebanon

Jo

Jo

Administrator
Master Penguin
First shipment of oil and gas drilling equipment arrives

BEIRUT: The first shipment of equipment to be used for Lebanon’s first oil and gas drilling exploration in the Mediterranean Sea arrived at Beirut Port Saturday, Energy Minister Nada Boustani announced.

In a tweet on her official Twitter account, Boustani said, “Lebanon begins the countdown.”

The minister said Thursday that work on drilling the first exploratory well will begin in December, in Block 4, situated off the coast of Beirut.

[...]

More and pictures here: First shipment of oil and gas drilling equipment arrives
 
  • Advertisement
  • Omeros

    Omeros

    Legendary Member
    Orange Room Supporter
    If confirmed anno fi.

    They need 55 days to confirm
    اي وشو صار بالشركات اللي بهيئة ادارة النفط ؟
     
    Joe tayyar

    Joe tayyar

    Legendary Member
    Orange Room Supporter
    خافو عملت حوار من شي 4 سنين مع حدن من هيئة ادارة النفط
    اذا بتشوفو وبتعرفو بالخناقات اللي جاي بتقولو يا محلا غير خناقات
    That was 4 years, now all mitif2een on oil and gas ma fi maz7 bil mawdou3
     
    Joe tayyar

    Joe tayyar

    Legendary Member
    Orange Room Supporter
    Yalla say thank you ya shatreen!

     
    Top